|
To obtain coverage under the permit, the operator and or owner of theconstruction site must develop and implement a storm water pollution prevention plan (SWPPP) and must submit a Notice of Intent (NOI) form to the designated Regional Water Quality Control Board (address identified on the NOI form) prior to the commencement of construction activity. NOI fee (based on project size) must be submitted at the same time to the Regional Water Quality Control Board (address identified on the NOI form).
All applicants for coverage under the permit are required to have a Storm Water Pollution Prevention Plan. SWPPPs must be developed and implemented in accordance with the permit prior to submitting the NOI or posting the site notice. Several items are required in a SWPPP, including:
- Site maps showing drainage and discharge locations, and the locations of control measures;
- A description of the site and of the pollution prevention Best Management Practices or BMPs (i.e. erosion & sediment control, tracking control, wind erosion control, non-storm water management & waste management BMPs); and
- Inspection procedures and reports.
- Sampling and Analysis Plan.
Guidance on SWPPP development and the implementation of appropriate BMPs is available from EPA and on this site in the Training section.
|